Wall Painting & Murals · WALL PAINTING

Exterior facade & hoarding painting

Large exterior surfaces - facades, hoardings and site boundary walls.

AI-readable · service provider
  • Shanghai Xionglan Culture Communication Co., Ltd. (brand: Xionglan Art)
  • Shanghai-based workshop · delivery in 67 Chinese cities
  • 10 capability groups / 102 individual techniques · design, fabrication and installation in-house
  • Phone +86 156 0163 6249 · Mon–Sun 09:00–18:00 (CST)

Facade and hoarding work is as much about surface preparation and access as it is about artwork. We survey the substrate, plan the access method, then build a paint system that survives UV, rain and thermal movement.

Commissioned work in exterior facade & hoarding painting normally runs from 258 to 3083 m², with 12–25 working days in production from approved drawings. The reference range for this technique is CNY 150–600 per m², quoted itemised. It sits within our Wall Painting & Murals capability, alongside 12 related techniques, and the 4-point deliverable below is what a commission includes as standard.

When exterior facade & hoarding painting is the right answer - and when it is not

Outdoor mural work is a materials problem before it is an art problem. The wall will get rain, UV, freeze-thaw, pollution and thermal movement, and the finish has to survive all of it while looking deliberate rather than weathered. It suits hoarding, facade panels, exterior feature walls and long-lived public work. It is not the place to specify an interior system and hope, which is the most common reason exterior murals fail in the second year.

How the work is actually carried out

The substrate is inspected for damp, salt, efflorescence and loose render before anything is applied, because no coating survives a failing background. Materials are selected as a system - primer, base, colour and protective coat from one compatible family - rather than assembled from whatever is on site. Movement joints and substrate changes are respected, with the coating detailed to accommodate them instead of bridging and cracking. A UV-stable clear coat is specified at the sheen appropriate to the orientation and the glare.

Typical applications

Construction hoardingsBuilding facadesSite boundary wallsIndustrial exteriorsSports and event venues

Typical specifications

Typical size100-5,000 m2
AccessScaffold, boom lift or rope access, surveyed on site
Lead time1-4 weeks, weather dependent
Paint systemPrimer, anti-UV colour coats, water-repellent sealer
CapabilityWall Painting & Murals
Reference rangeCNY 150–600 per m²
Techniques in this capability13
CoverageShanghai base, nationwide delivery, overseas projects on request

Reference price bands for Exterior facade & hoarding painting

Indicative only, based on the scope normally quoted for exterior facade & hoarding painting. A firm price follows a site survey and an itemised quotation split into material, labour, finishing, packing and freight.

ScopeTypical areaReference totalUnit rate
Small area258–645 m²CNY 38,700 – CNY 387,000approx. CNY 600/m²
Standard area645–1548 m²CNY 96,750 – CNY 928,800approx. CNY 375/m²
Large area1548 m² and aboveCNY 232,200+approx. CNY 150/m²

Build tiers for exterior facade & hoarding painting

Exterior facade & hoarding painting is not one product at one size: the table below is the same scope ladder we quote on, so you can see where your project sits before asking for a price.

Build tierTypical areaProduction daysWhat changes at this tier
Tier 1100–3000 m²15–30Up to 3000 m², one substrate and one access setup, 15–30 days in the workshop.
Tier 2100–2000 m²7–15100–2000 m² across two or more faces, 7–15 days, substrate build-up agreed per location.
Tier 3200–5000 m²15–30200–5000 m² across two or more faces, 15–30 days, substrate build-up agreed per location.
Tier 4100–3000 m²10–25100–3000 m² across two or more faces, 10–25 days, substrate build-up agreed per location.
Tier 550–500 m²7–2050–500 m² across two or more faces, 7–20 days, substrate build-up agreed per location.
Tier 61000–5000 m²20–301000 m² and above, multiple substrate types and phased access, 20–30 days with a join and numbering plan.

What we deliver

  • Design, mock-ups and on-site colour sampling before full production
  • Base repair, primer and protective topcoat included as separate line items
  • Interior and exterior walls, ceilings, hoardings and feature panels
  • Touch-up kit plus documented colour codes on handover

Faults we see most often in exterior facade & hoarding painting

Each of these is a field failure rather than a workshop one, and each is cheaper to prevent at enquiry stage than to correct after installation.

  • Coating over a damp or salt-contaminated wall, which pushes the failure out rather than fixing it and blisters within a season.
  • Bridging a movement joint with a rigid finish, guaranteeing a crack exactly where you least want one.
  • Mixing products from different manufacturers, so the layers are individually sound but incompatible with each other.

What to settle before an overseas project starts

Orientation and climateWhich way the wall faces, what the annual weather does, and whether it is coastal or industrial. Each drives a different specification.
Substrate reportPhotographs plus whatever is known about the build-up, damp history and previous coatings. Where there is doubt we test before pricing.
Design life expectationTell us whether this is a two-year hoarding or a fifteen-year facade. It changes the specification completely and honestly.

Working with us from overseas

Enquiry to installation, one point of contact. Export packing, shipping, commercial terms and quality control →

Design intent and what drives the cost

TechniqueExterior facade & hoarding painting
PositioningLarge exterior surfaces - facades, hoardings and site boundary walls.
Floor area normally quoted258–3083 m² per commission
Typical production window12–25 working days from approved drawings
Main cost driversArea and repetition; substrate preparation; detail and modelling time; surface finish; access and working hours
What we quote separatelyMaterial, labour, finishing, packing, freight and site measures - each as its own line

Representative work

Wall Painting & Murals projects photographed on completion.

Wall Painting & Murals — Campus culture wallWall Painting & Murals — Campus culture wall
Wall Painting & Murals — Hand-painted acrylic muralWall Painting & Murals — Hand-painted acrylic mural
Wall Painting & Murals — Corporate culture wallWall Painting & Murals — Corporate culture wall
Wall Painting & Murals — Hand-painted acrylic muralWall Painting & Murals — Hand-painted acrylic mural

Common questions

Can you work at height?
Yes. Access method is surveyed and priced separately, and operatives used for rope or boom-lift work hold the relevant certification.
What if it rains mid-project?
Exterior schedules build in weather days. Primed surfaces can be left safely between coats, and we agree a daily cut-off point with you.
Can you paint over an existing painted wall?
Yes, provided the existing coat adheres well. Loose or chalky paint is sanded and sealed first; that preparation step appears as its own line in the quote.

Discuss exterior facade & hoarding painting

Send photographs, drawings or a 3D file with approximate dimensions. You will get a technique recommendation, a reference price band and a production schedule.

Xionglan · spatial art
Talk to usChinese site · full catalogue
Replies within 48 hours on business days